Warning: Use of undefined constant referer - assumed 'referer' (this will throw an Error in a future version of PHP) in /usr/home/essaywo/public_html/essays on line 102

Warning: Use of undefined constant host - assumed 'host' (this will throw an Error in a future version of PHP) in /usr/home/essaywo/public_html/essays on line 105

Warning: Cannot modify header information - headers already sent by (output started at /usr/home/essaywo/public_html/essays:102) in /usr/home/essaywo/public_html/essays on line 106

Warning: Cannot modify header information - headers already sent by (output started at /usr/home/essaywo/public_html/essays:102) in /usr/home/essaywo/public_html/essays on line 109
MRP - Paper

MRP


While I primarily address the inbound flow of inventory (materials management), II adds other interfaces such as finance, marketing, and integrated logistics. Like I, II is a push inventory model which pushes product through manufacturing and distribution processes in order to meet forecast demand. However, it adds further dimensions to the basic model. II not only considers the inbound flow of material, but also how much material can actually be handle within the plant. Furthermore, it actually handles production scheduling, labour needs, inventory budgets, and personnel needs. But the most important feature is the addition of the finance interface. This module provides the ...

Want to read the rest of this paper?
Join Essayworld today to view this entire essay
and over 50,000 other term papers

II includes the entire set of activities involved in the planning and control of production operations. It consists of a variety of functions of modules and includes production planing, resource requirement planning, master production scheduling, materials requirements planning ( I), shop floor control, and purchasing.
Process of II
Step 1 - Market Demand; the process begins with an aggregation demand from all sources. Examples of sources are firms’ orders, forecasts, and safety stock requirements.
Step 2- Production Plan; with inputs from manufacturing, finance, and marketing, the production plan would be derived.
Step 3- Rough-cut capacity planning; it involves short-term capacity considerations that are affected by irregularities in demand. It formulates benchmarks for the proper use of personnel, machines, and shifts. Bills of capacity and bills of labour resources are the primary inputs to determine rough-cut capacity. In the event of incapability in producing the ...

Get instant access to over 50,000 essays.
Write better papers. Get better grades.


Already a member? Login

- Allowing more planning flexibility
- Minimization of workforce overtime

Problems in Implementation of MRP II
Implementation an MRP II system is a monumental effort. The system requires a tremendous amount of information, which must be accurate if the system is to be successful. The MRP II systems is capable of affecting all function within Forges’s marketing, production, purchasing, accounting, finance and logistic. All personnel who have any interaction with the MRP II system require training. Further, Forges must be committed to make the MRP II system work. The problems that occur in implementing MRP are frequently organizational and behavioral rather than technical.

...

Succeed in your coursework without stepping into a library.
Get access to a growing library of notes, book reports,
and research papers in 2 minutes or less.


CITE THIS PAGE:

MRP. (2004, November 17). Retrieved April 28, 2024, from http://www.essayworld.com/essays/MRP/17637
"MRP." Essayworld.com. Essayworld.com, 17 Nov. 2004. Web. 28 Apr. 2024. <http://www.essayworld.com/essays/MRP/17637>
"MRP." Essayworld.com. November 17, 2004. Accessed April 28, 2024. http://www.essayworld.com/essays/MRP/17637.
"MRP." Essayworld.com. November 17, 2004. Accessed April 28, 2024. http://www.essayworld.com/essays/MRP/17637.
JOIN NOW
Join today and get instant access to this and 50,000+ other essays


PAPER DETAILS
Added: 11/17/2004 11:27:21 AM
Category: Miscellaneous
Type: Free Paper
Words: 1631
Pages: 6

Save | Report

SHARE THIS PAPER

SAVED ESSAYS
Save and find your favorite essays easier

SIMILAR ESSAYS
» Mrp Ii
» Internet The Advantages And Dis...
» The Importance Of Planning For ...
» Production Planning
» Essay on Information Technology...
» The Importance of Internet To S...
Copyright | Cancel | Contact Us

Copyright © 2024 Essayworld. All rights reserved